McKinly Lab will be demolished soon and replaced with a 3-floor, 131,000 sq-ft building to be completed in 2024. Pictured is the proposed front/back view. (newarkpostonline)
McKinly Lab will be demolished soon and replaced with a 3-floor, 131,000 sq-ft building to be completed in 2024. Pictured is the proposed front/back view. (newarkpostonline)